A multi staged extension, alterations and addition to an operational aged care facility
Stage one was an upgrade to the existing out door areas, the construction of a new 3 level deck, mechanical services upgrade and the installation of a site generator.
SECTOR
Aged Care
Architect
Vision Structures
CLIENT
Russian Relief Association of St Sergius
CLIENT PM
Vision Structures
COMPLETED
2023
CONTRACT TYPE
Construct Only
$
1.2
M
Project value
24
W
Weeks to Build
![](/app/uploads/2023/03/1211636-2560x1920.jpg)
Smooth
operation.
Our team of experienced construction professionals worked tirelessly to ensure that every aspect of the project was completed to the highest standard. This included carrying out a mechanical services upgrade, which involved installing new systems to improve the efficiency and functionality of the outdoor spaces.
In addition, we also installed a site generator to provide backup power in case of an outage, ensuring that the facility can continue to operate smoothly even in the event of a power failure. This generator was carefully selected to meet the specific needs of the site, taking into account factors such as capacity, efficiency, and noise levels.
![](/app/uploads/2023/03/1211702-2560x1920.jpg)