A multi staged extension, alterations and addition to an operational aged care facility
Stage one was an upgrade to the existing out door areas, the construction of a new 3 level deck, mechanical services upgrade and the installation of a site generator.
SECTOR
Aged Care
Architect
Vision Structures
CLIENT
Russian Relief Association of St Sergius
CLIENT PM
Vision Structures
COMPLETED
2023
CONTRACT TYPE
Construct Only
$
1.2
M
Project value
24
W
Weeks to Build

Smooth
operation.
Our team of experienced construction professionals worked tirelessly to ensure that every aspect of the project was completed to the highest standard. This included carrying out a mechanical services upgrade, which involved installing new systems to improve the efficiency and functionality of the outdoor spaces.
In addition, we also installed a site generator to provide backup power in case of an outage, ensuring that the facility can continue to operate smoothly even in the event of a power failure. This generator was carefully selected to meet the specific needs of the site, taking into account factors such as capacity, efficiency, and noise levels.
